+8615905360672

huaquan@huaquanpower.com

SHANDONG HUAQUAN POWER CO.,LTD

Industry informationHome>Industry information > Correct parking operation method for KMS series generator set

Correct parking operation method for KMS series generator set

Time:2025-03-24 16:02:40  Edit:HuaQuan
The correct parking operation method for KMS series generator set is important for ensuring the long-term stable operation of the equipment. The following are the basic steps for stopping the generator, aimed at helping users safely perform this operation:
KMS series generator set
一、 KMS series generator set preparation before parking
1. Check the equipment: Before parking, ensure that all parameters of the generator (such as oil level, water temperature, battery voltage, etc.) are within the normal range.
2. Load handling: Gradually remove the load, place all electrical switches in the shutdown position, and ensure that all adjustment knobs are reset to the corresponding positions when the machine is stopped.
3. Environmental factors: When the ambient temperature is below 5 ℃, all accumulated water in the water tank, water pump, and diesel engine cooling system should be drained to prevent freezing.
KMS series generator set
二、 KMS series generator set parking operation
1. Gradually reduce the speed: After unloading, gradually reduce the speed of the diesel engine to 600r/min, and then stop it according to the instructions for using the diesel engine. After shutdown, the supply oil pump should be started and run for no more than two minutes to ensure that the high-temperature area of the Cummins series generator set receives sufficient lubricating oil replenishment and heat dissipation.
2. Power off: Press the device shutdown button to gradually reduce the speed of the generator until it stops running. Turn off the device switch and disconnect the power cord to ensure that the device is completely powered off.
3. Close the valve: Close the fuel and gas intake valves to avoid fuel and gas leakage.
KMS series generator set
三、 Precautions for KMS series generator set after parking
1. Check the status: After parking, check whether the equipment has stopped running normally and confirm whether there is any fuel or gas leakage.
2. Cleaning and maintenance: Clean the surface of the equipment, remove carbon deposits, dust and other dirt, and prepare for the next start-up.
3. Record information: Record the parking time for future checks on equipment usage time and operating status.
 
Following the above steps for the parking operation of Cummins series generator sets can ensure the safety and stability of the equipment, while extending its service life. During the operation, it is necessary to strictly follow the operating procedures, pay attention to safety precautions, and avoid accidents.
More KMS series generator set information:http://www.soufadianji.com/

Sales hotline: +86 15905360672
WeChat customer service: +86 15905360672
Email address: huaquan@huaquanpower.com
Official website: https://www.huaquanpower.com
Production Base: No. 11666 Guting Street, Economic Development Zone, Weifang City, Shandong Province
Company Name:SHANDONG HUAQUAN POWER CO.,LTD