Before operating the Huaquan generator, the following preparations need to be made to ensure the normal start-up and stable operation of the generator set:
1、 Huaquan Generator Safety Inspection and Preparation
Check protective facilities and environment:
Ensure that the protective facilities of the generator set are complete and in good condition to prevent accidents during operation.
Check the working environment of the Huaquan generator to ensure good ventilation, no flammable or explosive materials, and no debris that hinders operation in the surrounding area.
Check the status of the unit:
Inspect the appearance of the Huaquan generator for any oil, water, or gas leaks.
Confirm that the generator set has no obvious damage or foreign objects, and ensure that the unit is in good operating condition.
Check the connection line:
Confirm that the power lines, control lines, and other connections of the generator set are securely connected without any looseness or detachment.
Check if the circuit connections meet the standards to avoid safety hazards such as short circuits and leakage.
2、 Huaquan generator fuel, oil and coolant inspection
Fuel inspection: Confirm that the fuel in the fuel tank is sufficient, the fuel quality is good, and there are no impurities or moisture. For generator sets that have not been used for a long time, the fuel should be checked for deterioration and replaced with new fuel if necessary.
Oil inspection: Confirm that the oil in the oil tank is sufficient and the quality of the oil meets the requirements of the unit. Check if the oil filter is clean and replace it with a new one if necessary.
Pay attention to the viscosity of the engine oil and seasonal changes to ensure that the oil can flow normally at low temperatures.
Coolant inspection: Confirm that the coolant in the coolant tank is sufficient and the coolant quality is qualified. Is the valve of the coolant system normal and there is no leakage in the pipeline.
3、 Huaquan Generator Battery and Electrical System Inspection
Battery inspection: Confirm that the battery has been fully charged and the voltage is normal. Check if the battery connection is secure, free from looseness or corrosion. For generator sets that have not been used for a long time, the battery status should be checked regularly and charged or replaced if necessary.
Electrical system inspection: Confirm that the switches on the generator set (such as air switches, start switches, etc.) are in the correct position. Check if the signal light indicator is normal and confirm that there are no alarms or fault prompts.
4、 Commissioning and preparation of Huaquan generator before starting
No load debugging: Before starting the generator set, perform no-load debugging and observe whether the readings of various detection instruments of the unit are normal. Confirm that the unit has no abnormal noise, oil leakage, air leakage, coolant leakage, or other phenomena.
Load debugging (if applicable): After normal no-load debugging, gradually load the unit to its rated power and observe the operation of the unit. Confirm that the unit operates stably under load, and that parameters such as voltage and frequency meet the standards.
Preparation before using Huaquan generator: Confirm that the voltage and frequency of the generator set match the local grid voltage and frequency. For generator sets that require long-term operation, consider adding cooling water to maintain stable unit temperature.
5、 Huaquan generator operator prepares
Professional training: Ensure that operators are familiar with the structure, performance, and safety operating procedures of the generator set.
Operators should have certain knowledge of electricity and emergency response capabilities.
Safety protection: Operators should wear labor protection equipment such as insulated gloves, safety helmets, etc. during the operation process. Maintain a safe distance from live equipment to avoid electric shock accidents.
Before operation, Huaquan generators need to make comprehensive preparations, including safety inspection,
fuel oil and coolant inspection, battery electrical system inspection, commissioning before startup, operator preparation, recording and maintenance, etc. These preparations help ensure the normal start-up and stable operation of the generator set, extending its service life.